Construction Schedule

A PDF of the construction schedule for the Bexhill-Hastings Link Road (through the beginning of 2015) can be downloaded here (and is also reproduced at the bottom of this page). Maps of the relevant areas, also reproduced below, are available as PDFs here, here and here respectively (compare with the CHD “grid” here).

conds 9,10&20 sheet 1 of 3 rh haul road rev 8

conds 9,10 &20_sheet 2 of 3 rh haul road rev 5  conds 9,10 & 20_sheet 3 of 3 rh haul road rev 9 The construction schedule:condition 4 - 05.03.13 appendix g - summary programme gantt chart